US TOOL
PROJECT NAME
US Tool
 
CITY, STATE
Farmington, MO
 
CLIENT NAME
US Tool
 
PROJECT SIZE
235,000 square feet
 
SERVICES PROVIDED
MEP Engineering
 
PROJECT SCOPE:
 

G&W was selected to provide the Mechanical, Electrical and Plumbing system and infrastructure improvements for the renovation of an existing 233,500 square foot manufacturing facility.  US Tool is combining two existing facilities into the newly remodeled building to increase operational efficiencies. G&W mechanical design consisted of the air conditioning system for the 125,500 square foot Production section of the building that will consist of Air Rotation Air Handling Units and 300 ton direct expansion air cooled condensing units.  The existing Warehouse heating and ventilation system will be modified and repurposed.  Process lubrication, oil mist recovery system, compressed air and dust collection systems are requirements for various production processes.  G&W electrical design consisted of redistributing the one existing 2,000 amp and one existing 4,000 amp 480V–3Ph–4W main distribution switchgear and the design of the power distribution to serve all new and relocated production equipment.   Fluorescent High Bay lighting for fine parts processes illumination for the entire production area.  G&W is reconfiguring the power distribution for multiple voltage production machines.  G&W is designing full MEP systems for a full service kitchen and Dining/Assembly room and toilet locker core.

© G&W Engineering Corporation