
PROJECT SCOPE:
G&W was selected to provide the MEP system design for the new state of the art library. The MEP design consisted of a fully air conditioned building including two dedicated outside air handling units, fan coils, heat recovery variable refrigerant condensing units and a duct free split system, new electrical service and distribution, lighting, electric water heater, waste/vent water piping and domestic water services.