BALLWIN BAPTIST CHURCH
 
PROJECT NAME
Ballwin Baptist Church Addition
 
CITY, STATE
Ballwin, Missouri
 
CLIENT NAME
Mitchell & Hugeback Architects
 
PROJECT SIZE
12,500 square feet
 
SERVICES PROVIDED
MEP & FP Engineering
 

G&W was selected to provide the MEP system design for the 12,500 square foot educational facility addition. The MEP design consisted of a fully air conditioned building including Variable Air Volume Air Handling Unit, fan terminal units with electric heating coils and condensing units, electrical distribution upgrades, lighting, roof drainage system, waste/vent piping, and domestic water services.

PROJECT SCOPE:
 

© G&W Engineering Corporation