GESA CREDIT UNION
 
PROJECT NAME
GESA Credit Union
 
CITY, STATE
Kennewick, Washington
 
CLIENT NAME
Clayco Corp.
 
PROJECT SIZE
5,600 square feet
 
SERVICES PROVIDED
MEP & FP Engineering
Sustainability & LEED Consulting
Energy Modeling
 
LEED: CERTIFIED
PROJECT SCOPE:
 

G&W Engineering served as the Engineer for the Mechanical, Electrical and Plumbing system design of a 5,600-square-foot branch facility for Gesa Credit Union in Kennewick, Wash. The new building features a unique circular front with a standing seam metal roof and lobby clear height of 22 feet, as well as a free-standing drive-up facility; all of which provides great presence on the site and are distinctive in the area.  G&W designed the new branch with sustainable strategies to achieve certification in the U.S. Green Building Council's LEED Green Building Rating System. Sustainable items include:  water saving fixtures which reduce consumption by 45%, energy efficient systems which decrease electric use by 22% and decrease gas use by 43%, eco-friendly refrigerants, over 75% natural lighting in occupied spaces and over 90% outdoor views in occupied spaces.

 

© G&W Engineering Corporation