GESA CREDIT UNION
 
PROJECT NAME
GESA Credit Union
 
CITY, STATE
Richland, Washington
 
CLIENT NAME
Clayco Corp.
 
PROJECT SIZE
80,200 square feet
 
SERVICES PROVIDED
MEP & FP Engineering
Sustainability & LEED Consulting
Energy Modeling
 
LEED: CERTIFIED
PROJECT SCOPE:
 

G&W Engineering served as the Engineer for the Mechanical, Electrical and Plumbing system design of a 80,500-square-foot home office and branch facility for Gesa Credit Union, the largest financial cooperative in Southeastern Washington. Completed in just 14 months, the new four-story operations facility features a full-service branch on the main floor, along with training rooms, community rooms, and drive-up services with two-way remote video.  The building is also equipped with state-of-the-art technology, such as smart boards in many of the conference rooms, biometric access to the safe deposit boxes, cash dispensing machines for faster transaction processing, and deposit taking ATMs.  G&W designed the new home office and branch with sustainable strategies to achieve certification in the U.S. Green Building Council's LEED Green Building Rating System. This is the first credit union home office and branch facility in the state of Washington to be built to achieve LEED certification. GESA Credit Union’s new facility features a number of green design and construction features to positively impact the Tri-Cities community.

© G&W Engineering Corporation